De-Risk Your China Sourcing

Move your China parts to an Indian manufacturer who reproduces them exactly — same specs, same fit, same performance. 

Localization Plan in 7 Days

China vs India: Compare the True Landed Cost, Not Just Unit Price

A lower component price from China can become expensive once tariffs, anti-dumping duties, freight volatility, compliance exposure, and supplier concentration risk are included.

India Source

More Predictable Landed Cost

China Plus One

Quoted component cost

Competitive

Tariff exposure

Lower

Anti-dumping risk

Lower

Freight buffer

Moderate

Supplier dependency

Reduced

Dual-source fit

Strong

Strategic Advantage

China+1 Manufacturing Partner

VS

Unit price shows the quote. Landed cost shows the real impact.

China Source

Higher Risk, Hidden Costs

China Plus One

Quoted component cost

May appear lower

Tariff exposure

10% to 25%+

Anti-dumping risk

Sudden increase

Freight buffer

Higher

Supplier dependency

High

Dual-source fit

Needs backup

Main Concern

Unpredictable Landed Cost

Parts We Helped Shift from China to India

See examples of components Frigate has manufactured in India for customers who were previously sourcing similar parts from China.

How Frigate De-Risks Your China Sourcing

Frigate converts your China-sourced part into a validated India-made part, ready for controlled production.

Sample Study

Technical Analysis

Design Development

Tooling Trial

Validation Approval

Production Tracking

Solving the Hidden Pain Points in China Sourcing

Frigate helps buyers move from unclear supplier communication, tool ownership concerns, and limited process visibility to a more controlled India-based  manufacturing model.

China Sourcing Pain Points

What Buyers Often Face

Delayed Communication

Slow responses, unclear technical replies, and limited engineering discussion.

Tool Ownership Gaps

Unclear tooling terms, storage, maintenance, tool life, and ownership visibility.

Limited Process Declaration

Low visibility into material, process route, manufacturing method, and finish details.

Weak Documentation

Limited inspection reports, quality records, validation data, and shipment documentation.

Frigate Control Layer

What Buyers Get Instead

Direct Technical Communication

Clear RFQ discussions, engineering feedback, project updates, and faster decision-making.

Defined Tool Ownership

Clear tooling terms, tool life, maintenance responsibility, storage, and buyer-owned tooling support.

Technical & Process Declaration

Documented material grade, process flow, manufacturing route, surface finish, and feasibility review.

Quality Documentation

Inspection reports, material certificates, PPAP support, control plans, and shipment-wise records.l Ownership

India vs China Trade Deal Position

A cleaner country-level comparison helps buyers quickly understand trade access strength without clutter from individual agreement names.

China Plus One

Country

India

13+

Signed Trade Deals

Supports China+1 sourcing

Growing global trade access

Improves export flexibility

VS

Clean Comparison

Only India vs China and total signed trade deals.

Buyer Relevance

Helps buyers compare sourcing advantage at country level.

China Plus One

Country

China

19+

Signed Trade Deals

Established trade position

Global manufacturing benchmark

Useful sourcing comparison base

India Focus

India’s growing trade network strengthens its China+1 position for global buyers.

Comparison Focus

China remains the benchmark, while India is evaluated as an alternative sourcing base.

Why This Helps

Removing deal names keeps the section cleaner and makes the comparison easier to understand.

India vs China Import Duty Comparison

India shows lower tariff exposure across key buyer markets, strengthening its position for China+1 sourcing.

7/7

Markets where India has lower tariff exposure

USA

India 7.6%

China 19.3%

Mexico

India 5.1%

China 20.0%

Australia

India 4.7%

China 17.6%

Saudi Arabia

India 4.6%

China 9.8%

Canada

India 6.6%

China 18.8%

Europe

India 8.9%

China 20.7%

UAE

India 5.0%

China 12.1%

India Strengthens the China+1 Shift

India gives global buyers a stronger sourcing base through lower duties, wider trade access, reduced China dependency, and export-ready manufacturing support.

01

Lower Duties

Improves landed-cost competitiveness in major import markets.

02

Trade Access

Expands sourcing reach across global trade networks.

03

Risk Reduction

Reduces dependency on China-led supply chains.

04

India Sourcing

Builds a stronger export-ready manufacturing base

How We Delivered

Complex geometries, demanding timelines, strict standards, here’s how we’ve consistently delivered engineered solutions that move businesses forward. 

Complete Product & Process Capabilities

Frigate helps buyers shift from China-dependent sourcing to reliable India-based manufacturing, with complete support across products, processes, tooling, quality, and export supply.

1

Product Expertise

CNC parts, sheet metal, plastics, castings, forgings, rubber, silicone, heat sinks, and assemblies.

CNC Parts

Sheet Metal

Assemblies

2

Process Capability

Machining, fabrication, moulding, die casting, extrusion, welding, forming, finishing, and inspection.

Machining

Moulding

Finishing

3

Tooling & Development

Moulds, dies, fixtures, jigs, gauges, CAD support, prototypes, and production trials.

Moulds

Fixtures

Prototypes

4

Assembly Support

Part-to-part assembly, inserts, seals, fasteners, hardware installation, testing, and packaging.

Inserts

Fasteners

Testing

5

Quality & Documentation

Dimensional inspection, material reports, PPAP, control plans, inspection reports, and shipment records.

Inspection

PPAP

Reports

6

Export Supply

EXW, FOB, CIF support, export packaging, labeling, documentation, and dispatch coordination.

Packaging

Documents

Dispatch

China Plus One

Component Assembly

China Plus One

Sub-Assembly Integration

China Plus One

Final Readiness

Assembly & Sub-Assembly Capabilities

Frigate builds complete assemblies, not just parts, helping customers simplify sourcing and receive ready-to-use modules.

APQP Stage Deliverables

Under our APQP methodology, every program is divided into defined approval stages. At each stage, you receive clear documentation, validation data, and review inputs before the project moves forward.

China Plus One

Material Controlled

China Plus One

Engineering Controlled

China Plus One

Performance Controlled

China Plus One

Production Controlled

China Plus One

Approval Controlled

Why Overseas Buyers Pick Frigate

Frigate gives overseas buyers controlled manufacturing, export-ready documentation, and clear project ownership from sample to shipment.

China Plus One
China Plus One

5

Owned Factories

Committed production capacity with direct control. Not a broker. Not a marketplace.

China Plus One

19

Active Export Markets

Shipping support across North America, EU, UK, Japan, Korea, and Southeast Asia.

China Plus One

100%

Material Match Control

Lab-tested material equivalents matched to your China-sourced part.

China Plus One

USD

Flexible Buyer Terms

USD invoicing with EXW, FOB, or CIF options.

China Plus One

4 Hrs

Fast Project Response

English project management with WhatsApp and email support.

China Plus One

AS9100D + ISO 9001

Certified Quality

Quality systems built for aerospace and industrial manufacturing standards.

Having Doubts? Our FAQ

Why should we consider India as our China+1 destination, and what makes Frigate specifically different from other Indian suppliers?

India offers the right combination of engineering talent, established manufacturing infrastructure, and cost competitiveness without the geopolitical exposure that's now pushing global OEMs to diversify. What separates Frigate from a typical Indian vendor is vertical integration. Most suppliers here handle one process and outsource the rest. Frigate covers precision machining, casting, forging, thermal assemblies, enclosures, and electrical sub-assemblies under a single roof, with a unified quality system. That means fewer handoffs, one accountable partner, and consistent with dimensional and process quality across your entire BOM, not just one component category. 

Our current Chinese supplier holds our drawings and tooling. How do we protect our IP when transitioning to a new manufacturer?

This is the most common concern OEM teams raise, and it's the right one to raise early. Frigate operates under strict NDAs and IP protection agreements before any drawing, specification, or design file is shared. All customer IP like drawings, CAD models, process parameters is stored on access-controlled internal systems, never shared with sub-vendors without explicit written approval. Tooling built for your program is your property, inventoried separately, and available for transfer audit at any point. We've supported multiple IP-sensitive transitions from China with zero IP breach incidents. 

What certifications does Frigate hold, and are they sufficient for aerospace and automotive OEM qualifications?

Frigate is certified to ISO 9001 and AS9100D, the latter being the quality management standard specifically required for aerospace supply chains, covering full traceability, configuration control, and corrective action systems. For automotive programs, we align with IATF 16949 process requirements. These aren't box-check certifications; audit records, process documentation, and PPAP-level inspection reports are available for OEM supplier qualification teams to review. If your SQE team needs an on-site audit before approval, we welcome it. We've passed supplier assessments from major aerospace and industrial OEM customers, and the documentation is available on request. 

How long does supplier qualification and onboarding typically take? We can't afford extended downtime in our supply chain.

For standard precision components, the qualification cycle runs 8–14 weeks, covering first article inspection (FAI), dimensional report submission, material traceability documentation, and functional validation. For complex assemblies or AS9100-governed programs, it can extend to 16–20 weeks depending on your internal approval gates. Frigate runs qualification in parallel with your procurement process; we don't ask you to pause sourcing while paperwork clears. Dedicated program managers are assigned at kickoff, with weekly milestone tracking shared directly with your supply chain team. 

What is the minimum order value, and can Frigate handle both low-volume qualification builds and full-scale production?

The minimum order value is $500, which makes prototype and first-article build commercially viable without forcing you into large commitments before the part is qualified. Once validated, Frigate scales to high-volume production runs with the same quality system and process controls; no process drift when you ramp. This matters because many suppliers treat qualification builds differently from production. Frigate uses the same tooling, operators, and control plans across both stages, so your FAI results actually reflect what you'll receive at production volumes. 

What product categories and manufacturing processes does Frigate cover? We have a mixed BOM; we don't want multiple new vendors.

Frigate's capability covers precision-machined components, sheet metal enclosures, industrial valves, thermal management assemblies (including liquid-cooled configurations), electrical sub-assemblies, castings, and forgings. Across materials, aluminium alloys, stainless steel, carbon steel, copper, and engineering polymers. The intent is to absorb as much of your BOM as possible under one supplier relationship, reducing your China-exit vendor count significantly. If you share your component list, we'll map which parts we manufacture in-house versus where we have qualified sub-vendors, so you have full visibility before committing. 

How does Frigate handle quality failures, rejections, or non-conformances at our end?

Every shipment includes full dimensional inspection of reports and material certificates. In the event of a non-conformance at your facility, Frigate's quality team initiates an 8D corrective action within 24 hours of notification, root cause, containment, permanent fix, and recurrence prevention. We maintain traceability to the specific batch, operator, and machine for every shipped lot, so fault isolation is fast. Replacement stock for qualifying NCRs is expedited without commercial dispute. Our goal is zero escapes to your production line, not dispute resolution after the fact. 

Can Frigate handle engineering changes in mid-production without disrupting lead times?

Yes, and it's one of the structural advantages of working with an integrated manufacturer. Engineering change requests (ECRs) go to a single point of contact, your program manager who coordinates across machining, tooling, QA, and documentation simultaneously. Because we're not managing multiple sub-vendors on your behalf, change propagation is faster and more controlled. Typical ECR turnaround for drawing revisions with no tooling impact is 5–7 working days to first-article of the revised part. For changes requiring new tooling, we'll give you a firm timeline at the point of review. 

What are typical lead times, and how does Frigate manage supply chain disruptions to protect our production schedule?

Standard production lead times run 4–8 weeks depending on part complexity and order volume. For repeat programs, we offer scheduled blanket order fulfillment with agreed call-off windows typically 2 weeks backed by raw material pre-stocking. Frigate maintains safety stock for active programs and dual-qualifies critical raw material sources to avoid single-point supplier risk on our end. Lead time commitments are contractual, not estimates; we build scheduling buffers into our production plan, not into your delivery promise. 

We're evaluating multiple China+1 suppliers. What is the honest case for Frigate versus a larger Indian tier-1 or a Southeast Asian alternative?

Fair question. Larger Indian tier-1s often have the right certifications but longer response cycles, higher MOQs, and less flexibility for mixed or complex BOMs. Southeast Asian alternatives like Vietnam, Thailand, Malaysia offer competitive pricing but typically in narrower manufacturing categories, with weaker engineering support for complex or toleranced parts. Frigate sits at the intersection: engineering-capable enough to handle AS9100 and precision-tolerance programs, operationally agile enough to take $500 qualification orders seriously, and structured enough that a Fortune 500 procurement team won't find gaps in documentation or quality systems. The honest ask is this, share your current China BOM, let us map capability and pricing, and you'll have a data-backed comparison rather than a pitch. 

We'd love to Manufacture for you!

Submit the form below and our representative will be in touch shortly.

LOCATIONS

Registered Office

10-A, First Floor, V.V Complex, Prakash Nagar, Thiruverumbur, Trichy-620013, Tamil Nadu, India.

Operations Office

9/1, Poonthottam Nagar, Ramanandha Nagar, Saravanampatti, Coimbatore-641035, Tamil Nadu, India. ã…¤

Other Locations

GENERAL ENQUIRIES

Get Quote
Support All File Formats Including - STEP | STP | SLDPRT | STL | DXF | IPT | X_T | X_B | 3DXML | CATPART | PRT | SAT | 3MF | JT files

LOCATIONS

Registered Office

10-A, First Floor, V.V Complex, Prakash Nagar, Thiruverumbur, Trichy-620013, Tamil Nadu, India.

Other Locations

GENERAL ENQUIRIES

Get Your Quote Now

New Get Quote form

Loading....